Contact check is a function to check whether the measurement target is connected correctly.
The timing of the contact check can be selected from three patterns: before measurement, after measurement, before and after measurement.
To perform a contact check, the trigger synchronous output function must be enabled.
When a contact check is performed, the measurement time will be longer by the time required for the contact check.